Ticket #1391

Work under high voltage is permitted if the distance between the highest point of the excavator and the high-voltage wires is not less than:

1 2 m
2 10 m
3 1.5 m
4 5 m
Law explanation
Working under high voltage is permitted if the distance between the highest point of the excavator and the power lines is not less than 2 metres.