Levelling of spoil banks is carried out:

1 by means of the bulldozer blade
2 with a single-bucket excavator
3 with a milling working part
Law explanation
Levelling of spoil banks is performed with the bulldozer blade. Levelling of the slope and bottom of a ditch is performed with a passive blade.